Recently, the sales department of the Vanke Lake and City project is under intensive construction. As one of the highlights, the 100-meter-long glass curtain bridge has attracted countless people's attention. But how to accurately and easily install each piece of heavy glass that is several meters high on the bridge, and the bridge is next to the children’s playground, the amusement facilities occupy almost all the open space, and there are green trees on the side, there is no extra space for equipment to be A difficult problem.
With the help of Kebu spider crane, the problem is solved. The Kebu spider crane is specially designed and developed for the narrow space and constrained sites. It is professional and sophisticated. I saw Kebu KB3.0 easily bypass the green trees, pass through the children’s amusement facilities, and stop at the bridge side. The operator is skilled Support the crane, extend the boom, and start installing the glass wall.
With the cooperation of the spider crane, the boom lifts each piece of glass accurately and easily. The operation is skilled, accurate and gentle, which greatly reduces the difficulty of glass installation. Workers install the glass quickly and with high quality, speed up the project progress, and save labor costs. The construction period was shortened. The original task of one week was completed in three days. The spider crane and small machinery played a big role! Professional and sophisticated!